<< Click to Display Table of Contents >> Navigation: Library > Editing the Process > Operation Editor > Operation Editor Reports |
**Reports are highly variable depending on the version and preferences requested. Some reports listed may or may not be present within your report menu**
Process Report: The Operation Process Report summarizes all activities found under the particular operation. It includes the total completion time required for the operation and lists details of the Activities under the operation. An operation must be selected to run this report.
Process Times Report: This report shows a breakdown of the VA/NVA/SVA time within the operation and what category the process time falls under (packing, machining, etc)
Observed Time Report: This report summarizes the observed time studies performed and saved for all activities in the selected operation.
Calculated Time Report: This report summarizes the calculated time studies performed and saved for all activities in the selected routing. You will be prompted to choose one time standard before the report is generated.
SOS Report: This report compiles reports for each operations under the routing. Each operation's report displays activity details, including tools and part descriptions.
SOP Report: This report compiles reports for each activity under the operation. Each activity report contains component, tool, and safety needs, as well as work steps and most of the other fields that can be edited in the Activity Editor.
Checked-out Processes Report: This report shows all processes currently checked out for edit. It displays the process ID, Process Type, Routing Type, and Description of each component and who checked it out. This report can be run from the Routing, Operation, or Activity Editors.
Work Instruction Report: This report shows all underlying activities' standard work in a detailed work instruction containing all work steps (SWAS). It can also show all of an operation's activities in a less detailed work instruction (SWS). Note: The names of the reports may vary.
Standard MURI Report: This report pulls data from the ergonomic tab of the calculated or observed time, depending on the time standard rank set in the Ergonomics Tab of the Options Menu. This data is presented in bar graph, pie chart, and spreadsheet form. The standard report accounts for the standard numbers, excluding all ergonomics to the right of transport in the spreadsheet (non standard ergonomic scores). This report is explained further in the Activity Reports section.
Empowered MURI Report: This report pulls data from the ergonomic tab of the calculated or observed time, depending on the time standard rank set in the Ergonomics Tab under Options Menu. This data is presented in bar graph, pie chart, and spreadsheet form. The empowered report accounts for all ergonomic scores and combines them into an OCRA score for the activity. This report is explained further in the Activity Reports section.
Time Comparison Report: This report shows and sums the calculated, estimated and observed VA, NVA, RNVA and Total times of activities by station. It provides the average work load percent based on the inputs of net Jobs per Hour and Overspeed %. The times can be displayed in percents or actual time format and the report can be filtered by models and options. This report can be run from the Component, Routing, Operation, and Activity Editors and the Line Balance Module.