Different Types of Changes in ECO

<< Click to Display Table of Contents >>

Navigation:  Library > Engineering Change Management > ECO Editor >

Different Types of Changes in ECO

There are several possible changes that can be received through an ECO. The following sections include a description and guidelines for Manufacturing Engineers to handle these changes in Assembly Planner.

For all cases below, treat the Parent Item as P1 (Rev. A) and the Child Item as C1 (Rev. A). Also, treat the ID of the ECO as ECO-0001.