<< Click to Display Table of Contents >> Navigation: »No topics above this level« Time |
The routing time tab adds up all of the sub-processes to calculate the time required to complete the entire routing. Assembly Planner gathers the estimated, observed, or calculated times for the activities or operations and rolls-up a total time for the routing.
A further description of the Time Tab is included under the Operation Editor Tabs section of this manual.