The data fields in the WI Report_2 body are –
1.Operation - the operation sequence number (OpSeqNo.) This is a column in the Operation list under the Routing level editor.
2.Station - the operation work center name. This is the Work Center column selection drop-down list in the Operation list under the Routing level editor. The Work Center selection list can be edited in Plant editor.
3.Revision - represents an updated version of the Operation. This can be changed in the Revision field under the custom fields tab at the Operation level or in the Operation list under the Routing level editor.
4.ActSeqNo - activity sequence number (ActSeqNo.) This is a column in the Activity list under the Operation level editor. Activities within an Operation are listed in ascending order by ActSeqNo in the report.
5.Activity Description - description of the activity. This is an input in the Activity list under the Operation level editor.
The remaining items for each Activity are grouped by Work Step Group number. A Work Step Group number should be assigned to every work step on the Work Step tab of the Activity. If a work step is not assigned a Work Step Group number, the work step will display on the report before all other work steps for that Activity. Work Step Group information within an Activity is listed in ascending order by Work Step Group number on the report.
6.Tools - resources/tools that are required for the Work Steps listed. Add the resources/tools under the Resource tab. Then specify which resource is used for each work step under the Work Step No column.
7.Parts Needed - consumption parts and quantities that are required for the Work Steps listed. Add the consumption/part under the Consumption tab. Then specify which Part ID is used for each work step under the Work Step No column.
8.Work Steps - steps within an activity. Work steps are created in the Work Step tab and each work step is assigned to a work step group in the Work Step Group column. The work steps will display on the report by the work step group number they are assigned.
9.Required - required dimension assigned to the last work step of the Work Step Group displayed. Assign a required dimension to the last work step in the Work Step Group in the Required Dimension column of the Work Step tab.
10.Actual - left blank for the operator to fill in at time of work step execution.
11. Image displayed - the image assigned to first work step of the Work Step Group displayed. Assign an image to the first work step in the Work Step Group in the SOP Image column of the Work Step tab after the image has been added to the Documents tab.
12. Attn Point - an attention point icon assigned to the first work step of the Work Step Group displayed. Assign an attention point icon to the first work step in the Work Step Group in the Icon column of the Work Step tab.